Deprecated: Function create_function() is deprecated in /home/planysweb/public_html/wp-includes/pomo/translations.php on line 208

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/planysweb/public_html/wp-content/plugins/types/library/toolset/types/embedded/includes/wpml.php on line 648

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home/planysweb/public_html/wp-content/plugins/types/library/toolset/types/embedded/includes/wpml.php on line 665
Structural Integrity Analysis of OSTT » Planys Technologies
logo

Case Studies

Structural Integrity Analysis of OSTT

Inspection at Visakhapatnam Port

The Problem

  • Off shore tanker terminal (OSTT) built in 1990 damaged in cycloneHudhud 2014
  • Estimated repair cost significantly lower than rebuilding cost
  • Underwater structure mapping critical in order to undertake repair
  • Surface surveys inconclusive due to turbulent waters

Planys Solution

  • Planys performed as-constructed vs. damaged position analysis to assess integrity
  • Analysis was used by client to refurbish existing structure leading to savings