The Problem

  • Intake pipeline (1km) of desalination plant not inspected since installation
  • Divers unable to inspect confined space more than 30m
  • Bio fouling growing inside the pipeline thus reducing the overall flow rate

Planys Solution

  • Assessed the condition of bio fouling inside the intake pipeline
  • Planys provided the first ever videographic evidence of the pipeline since installation